Mechanical:
Plumbing (sewer and drainage, domestic water supply),
HVAC system (Boiler room installation, chiller plantroom, AHUs, FCUs, EFs, VAV boxes, ducting, piping installation, commissioning and balancing),
Pipe insulation and labeling,
Fire protection system (sprinkler heads installation, fire pump installation and commissioning).
Electrical works:
Lighting, power (relays panels, wiring, conduits installation),
Fire alarm systems installation,
High voltage installation,
Main Switch-room, MCC panels installation,
Dimmer system,
Stand-by generator installation.
2001 US Embassy in Armenia
Security Upgrade Project, Main CAC
Mechanical (plumbing and HVAC).
Electrical works (lighting and power).
2002-2003 Yerevan Jewelry Factory
Design and electrical installation works.
2003 Nov. Apartments, 10 stories building, Pavstos Byuzand 53-55 Mechanical works (FCUs, radiators, boiler room and chiller plant room installation).
2004 July Marriott-Armenia
Hotel Complex Courtyard lighting and guestrooms electrical modification.
|